Cambridge Township
Rome Township
Mann Tile Drain May 29, 2018 tbd Survey, Design, Easements
Woodstock Township Clarks Cove June 12, 2019 tbd Schedule Day of Review
Adrian Township Titus Tile, S. Branch January 9, 2000 tbd Study Phase
Ridgeway Township Gittus Tile Drain March 13, 2025 tbd Construction
Franklin Township Burns Drain August 5, 2025 tbd Study